Fair Haven, N.Y. - The Army Corps of Engineers will slap a $100K band-aid on the Fair Haven break wall this summer.
The project is a temporary fix to the broken break wall in the tourism-dependent village. It should be done by the end of the year.
Fair Haven is still battling back after disastrous flooding in 2017.
The break wall is in shambles due to the high water levels on Lake Ontario.